top of page

Hazelmere

We designed and drafted the carpark, hardstand and roads within The Site’s area, which included:

Pavement levels

Bulk earthworks levels, including 3d strings

Stormwater design below the downpipes

Loading dock ramp design, including advice on turning circles and drainage

Investigation of alternative products – HDPE stormwater pipe and Eco-Bloc cells

© 2023 by Tadros Engineering Pty Ltd

bottom of page